Skip to main content
Loading…
This section is included in your selections.

The meters referred to in this chapter, and especially as listed in the charge schedule found in Section 13.26.050, are displacement type meters. Should a different type of meter be used or allowed by the City a different charge may have to be computed based upon the capacity of the meter used. The City shall have the right to establish the minimum meter size and type required. (Ord. 95-100 § 5, 1995; Ord. 86-07 § 1, 1986.)