Skip to main content
Loading…
This section is included in your selections.

All significant industrial users shall make wastewater acceptable under the limitations established herein before discharging to the POTW. Any facilities required to pretreat wastewater to a level acceptable to the Director shall be provided and maintained at the industrial user’s expense. Detailed plans, compliance schedules and operation procedures shall be submitted to the Director for review, and shall be acceptable to the Director before construction of the facility.

The review of such plans and operating procedures will in no way relieve the industrial user from the responsibility of modifying the facility as necessary to produce an effluent acceptable to the Director under the provisions of this chapter. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to and acceptable to the Director at least ninety (90) days before the change. No industrial user shall attempt to dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with any local, state or federal discharge standard. (Ord. 22-42 § 42, 2022; Ord. 92-22 § 2, 1992; Ord. 84-105 § 1, 1984.)