Skip to main content
Loading…
This section is included in your selections.

(A) Inspections. Regular inspections of the Stormwater Management System construction shall be the responsibility of the Developer’s engineer or other Property Owner’s representative who has been approved by the City Engineer and inspection results forwarded to the City. For certain types and locations of Stormwater Treatment Facilities, the City Engineer may at her/his discretion require additional or parallel inspections by City staff.

(B) As-Built Plans. All Applicants are required to submit actual “as-built” plans for any constructed Stormwater Treatment Practices. The plan must show the final design specifications for all Stormwater Treatment Facilities and must be certified by the Developer’s engineer. A final inspection by the City is required before the release of any performance bonds can occur. The City Engineer will determine required elements of the as-built plans.

(C) Post Construction Certification. Prior to refunding of performance bonds, the Developer’s engineer, or other party approved by the City Engineer, must certify that the Stormwater Treatment Facility is fully functional and has been installed in accordance with the approved plans. For Developments not requiring a performance bond, the certification shall be made prior to issuance of a Certificate of Occupancy. (Ord. 09-25 § 2, 2009.)